LocationWimbledon, London SW19
Building typeShopping centre and leisure complex
ServiceHigh-level internal cladding preparation and commercial spray coating around the retractable roof
Coating systemI professionally spray-applied a Selemix Direct 2K polyurethane coating system to provide a smooth, hard-wearing and uniform finish suitable for a busy commercial environment.
ColoursRAL 9010 Pure White
Before work began
Original condition
The existing cladding panels around the retractable roof had an aged and inconsistent appearance and required preparation before a new coating could be applied. The considerable height, long panel runs and restricted access made this a technically demanding refurbishment project.
Because I was working inside the main public hall, all surrounding surfaces and equipment required thorough protection from sanding residue and airborne spray.
The Apex standard
Preparation
I inspected and thoroughly sanded the cladding panels to remove surface imperfections, create a suitable key and promote strong coating adhesion.
I then carefully taped, masked and protected all surrounding areas with plastic sheeting. Working at heights exceeding 20 metres, I used a specialist spider lift to safely access the cladding beneath and around the retractable roof.
Detailed preparation and masking enabled me to achieve clean edges while protecting the surrounding structure throughout the spraying process.
Completed finish
The result
The completed cladding now has a clean, bright and consistent white finish that complements the modern interior of Wimbledon Quarter. Despite the challenging access, extremely long panel runs and working heights of more than 20 metres, I successfully completed the spraying works using a specialist spider lift.
Shortly after I finished, the retractable roof was opened to reveal the newly refinished cladding around the main hall. The area was refreshed and ready to welcome the crowds visiting Wimbledon during the Championships.